This project includes a 27,000 sf addition at Gaines Elementary School, featuring new classrooms, gang bathrooms, a professional learning area, and a stage within the existing gymnasium. The scope also involves rerouting underground utilities to support the new construction and installing a full-building roof replacement. The team anticipates completing the additions and re-roofing ahead of […]
10.20.2025
Westminster Christian Academy – Lower School
The Westminster Christian Academy Lower School project involved constructing a modern 26,680 sf building with 17 classrooms, including dedicated art, music, and STEM spaces. A central media center fosters student learning, while a new reception area and improved pickup/drop-off zone enhance functionality and safety. Site improvements included integrating prior parking upgrades, a new walking path, […]
09.11.2025
Carver Middle School
Construction began in Summer 2025 on a comprehensive renovation and expansion of Carver Middle School. The project includes major site improvements and the addition of a new classroom wing, cafeteria, and fine arts spaces, all seamlessly connected to the existing facility by Summer 2026. In addition to the new construction, Grahl Construction will complete a […]
08.19.2025
Athens Area Career Academy | BioManufacturing Lab
The Athens Area Career Academy renovation project consisted of transforming 4,404 square feet of classroom space into a state-of-the-art biomanufacturing lab. The new facility includes specialized lab areas, modern classroom space, and advanced equipment to support the Academy’s growing biotechnology pathway. This upgrade provides students with hands-on training opportunities in a professional-grade environment designed to […]
08.19.2025
Prince Avenue Christian Middle School
Prince Avenue Christian School expanded its campus with a 19,000 sf new middle school building designed to accommodate significant enrollment growth. The project features spacious science labs, dedicated art classrooms, and traditional learning spaces that support a wide range of academic needs. In addition to classrooms, the building includes modern administrative offices and support areas, […]
08.19.2025
Apalachee High School
A multi phase renovation modernized athletic and instructional facilities, enhancing the experience for students and staff. Upgrades included a new central plant, state of the art press box, refreshed gym, updated locker rooms and coaches’ offices, new parking and sidewalks, and improved infrastructure for greater comfort, functionality, and efficiency across campus.
07.14.2025
Athens Area Career Academy | H.T. Edwards Culinary Kitchen
This renovation transformed an existing space into a vibrant retail bistro, open to the public, alongside a modern teaching culinary kitchen and additional classroom space. The project involved the installation of commercial grade kitchen equipment to support both educational and operational needs, ensuring the facility can serve as a hands on learning environment while also […]
07.14.2025
Clarke Middle School
Grahl Construction delivered the new Clarke Middle School through a 2½-year phased process, keeping the existing campus operational. The facility introduces modern spaces that enrich student life, including advanced science and art labs, larger classrooms designed for collaboration, and state-of-the-art sports facilities. A greenhouse and on-site health clinic further support student wellness and hands-on learning. […]
07.14.2025
Cedar Shoals Field House
This two story facility is designed for administrative and athletic functions. The first floor features a spacious open area, a serving kitchen, coaches’ office suites, and a conference room. The lower level houses a weight room, athletic training room, equipment room, physical therapy room, and multiple locker rooms. Built on a tight site next to […]
07.14.2025
Bay Creek Elementary
The Bay Creek Elementary School project was a 7-phase renovation and 17,000-SF addition that transformed the campus with major interior upgrades and exterior improvements. Carefully phased construction minimized disruption, with two phases of interior work completed during the summer of 2020—accomplished in the time typically allotted for just one. Inside the school, eight classrooms and […]
07.12.2025
Advantage Behavioral Health
The Advantage Behavioral Health project delivered a full renovation of the health campus, transforming it into a modern facility designed to meet both clinical and community needs. Inside, the work included all-new MEP systems, updated clinical areas, a critical stabilization unit, office and breakroom spaces, welcoming waiting areas, and even an indoor basketball gym to […]
06.20.2025
Hillel At UGA
The Hillel at UGA project transformed a former bookstore into a vibrant new home for the organization’s campus operations. The renovation included the addition of a fully equipped commercial kosher kitchen, installation of a new elevator, and complete upgrades to all MEP systems. Interior spaces were finished with modern materials to create a welcoming environment […]
06.20.2025
Barrow Arts & Science Academy Phase II
This state of the art facility was designed to inspire creativity, innovation, and learning. The building features a stunning learning stair area, a welcoming snack shop, a secure vestibule for enhanced safety, and modern administrative offices. Students thrive in cutting edge science labs, dedicated band rooms, dynamic art stations including fully equipped pottery kilns and […]